LAYOUT ANALYSIS OF RECYCLING PLANTS AND ARRANGEMENT ACCORDING TO LEAN MANUFACTURING

This study aims to develop recycling facilities using lean production tools. An exemplary plastic recycling facility was selected to carry out the study. First of all, the existing facility was analyzed and a layout plan was prepared. As a result of the initial analysis, important points that caused visible problems in the facility were identified. Machinery and personnel usage rates in the facility were analyzed with the Arena simulation program. As a result of all analyses, problems were identified. Then, U type production line, 5S, Kaizen etc. are implemented on the facility. An alternative model was created by making improvements with the tools and simulated with the same program. As a result, it was observed that both the number of personnel required decreased and the machine and personnel usage rates increased.